INSTALLATION TECHNIQUE


HANS LAMINATED FLOORING

Hans is an innovative flooring technology from Germany. It is manufactured from high density fiber board (HDF) laminate with layers of composite materials to form a strong and long lasting wood based flooring.


   
Tongue and groove construction
   
If you are laying the flooring on top of an existing floor, you will need to saw off the base of the door frame.

Remove just enough to allow you to slide the floor lining and a board into the gap.

Remove the old skirting boards in the room.
   
Clean the old floor. Lay the plastic sheeting and the floor lining (plastic sheetings should overlap by 20cm).
   
Check that no boards are damaged. Saw and lay the first 2 rows of flooring without gluing them. To compensate for movements in the flooring caused by changes in the weather, leave gap of 8-10mm to walls, thresholds, pipes, stairs, columns and other permanent fixtures. Lay the first board with the two grooved edges against the wall.
As shown in figure, add spacer blocks to straighten the rows.
   
Start the second row with the piece of board left over from the first (The left-over piece should not be used if length is less than 20cm).
   
Stagger the boards by at least 20cm, as shown in figure.

Next

....................

Copyright © 2002 Trendway Builders, Inc.. All rights reserved.
Website developed and hosted by WebFocus Solutions, Inc.